A restaurant group in Manila had a grease exhaust run that passed inspection on paper and failed in the ceiling. The duct was built like a normal HVAC branch: Pittsburgh lock on the long seams, TDF corners at the flanges, a bead of mastic on the outside. Twelve months of frying put enough grease into those lock seams that it dripped out of the joints and stained the gypsum board below. The contractor had built a duct that moved air well and contained nothing.

Grease exhaust is a different product. It has to be liquid-tight, smooth on the inside, and reachable for cleaning. Once you accept that, the way you use a duct line changes.

Why a normal HVAC seam is not good enough

A Pittsburgh lock is a mechanical fold with a gap inside it. On a supply-air duct that gap is sealed with mastic and it stays sealed because the pressure is low and the air is dry. On a kitchen exhaust the gap fills with hot grease, and grease finds its way through the smallest capillary path. Then it cools, thickens, and keeps pushing.

That is why most codes, including NFPA 96 in the markets I work in, require grease duct joints and longitudinal seams to be continuously welded and liquid-tight. Internal seams must be smooth, with no protruding fasteners or laps that can catch a cleaning brush. A mechanical lock has no place here, even though the forming machine can make one perfectly.

What the line is still good for

Use the line for what it does well: coil straightening, accurate cutting, notching, beading, and forming the flange profile at each end. The longitudinal closure of a grease duct is welded by hand or by a dedicated seam welder after the blank leaves the line. I tell buyers this plainly, because some of them assume that buying an automatic line means every duct it produces is automatically code-compliant. It does not. The line produces a very accurate blank; the welding makes it a grease duct.

On a CNC plasma table, grease duct blanks are cut with a common-line nest to keep material usage up and with the holes for access doors already in the program. Cutting after forming is a mistake here; the heat distorts a flanged edge and you spend the afternoon re-squared it.

Material: 16 gauge is the floor

Grease duct is normally 1.5 mm, which is 16 gauge in the imperial naming most kitchen contractors use. Thinner sheet warps under the welding heat and will not survive repeated cleaning. Stainless 304 is the common choice, with 430 used where the budget is tight and the exhaust is not especially corrosive. Carbon steel is allowed in some jurisdictions with a rust-resistant coating, but the coating has to survive both the grease and the cleaning chemicals, which is a big ask.

MaterialThicknessWeldingResistance to cleaning chemicalsTypical use
304 stainless1.5 mmTIG, argon purgeExcellentRestaurants, hospitals, labs
430 stainless1.5 mmTIG, no purge needed for interiorGoodLow-budget kitchen exhaust
Carbon steel + coating1.5 mmMIG or stickFair; coating wearsIndustrial kitchens, short runs
316 stainless1.5 mmTIG, argon purgeExcellent, best for saltsCoastal sites, heavy cleaning

For a 600 mm by 400 mm duct, 1.5 mm sheet weighs about 12.3 kg per metre before flanges. A 20 m run is close to 250 kg of steel, which is why the support design matters as much as the duct itself. Supports every 2.5 m, with a clearance of at least 450 mm to combustible material unless the duct is listed and enclosed.

Forming and welding without creating crevices

Keep the bead pattern shallow on grease duct. A deep bead on the face of a 1.5 mm section creates a channel on the inside that a brush cannot clean properly. If stiffness is needed, use an external angle frame rather than a deeper bead. It costs more in steel and saves arguments at inspection.

Longitudinal seams are butt joints with a 1 mm root gap, tacked every 150 mm and welded in short back-steps to control distortion. On 304 stainless I use a 2.4 mm filler at 90 to 110 A with an argon back purge; without the purge, the inside of the weld oxidises and becomes a rough brown streak that traps grease. Grind the weld flush on the inside and polish it to match the surrounding finish.

Flange joints use a high-temperature gasket, not ordinary closed-cell neoprene. A grease duct can see 200 °C at the hood and the gasket has to hold up to that repeatedly. Silicone rated to 250 °C is the usual answer. A spot welder fixes the flange to the duct at 100 mm pitch, with the spots ground smooth on the air side if the specification calls for a fully smooth interior.

Access doors are part of the design, not an extra

Every horizontal run needs a door within 3 m of the hood and then at intervals of no more than 3 m. Every change of direction needs a door. In practice that means a 300 by 300 mm door at each elbow and a 450 by 450 mm door in long straight runs so a man can get a brush inside.

The door has to be on the side a cleaner can reach, with at least 500 mm of working space in front of it. I have seen ducts with the doors facing a wall because the drawing was done in plan without checking the site. Those doors are useless and the client pays twice.

At the low point of any horizontal run, add a grease reservoir with a drain. A 50 mm deep sump with a 25 mm drain and a removable cleanout cap costs very little and stops grease pooling in the bottom of the duct, where it eventually finds the weakest joint.

Installation details that decide whether it passes

Slope horizontal runs at least 1 in 100 towards the reservoir. A level grease duct holds liquid; a sloped one moves it to a place where it can be collected. On a 12 m run that is 120 mm of fall, which is easy to build into the hangers and impossible to add later.

Keep the exhaust fan at the end of the run so the whole duct is under negative pressure. Any leak then draws air in rather than pushing grease out into the ceiling. That single decision prevents more call-backs than any gasket upgrade.

Where the duct passes through a fire-rated wall, use a listed fire damper or a rated enclosure that keeps the duct continuous. Cutting a grease duct to fit a standard rectangular damper breaks the welded continuity and creates exactly the joint you were trying to avoid.

QC before the duct leaves the shop

Weld visual. No undercut, no road-mapping, no oxidation on the inside. A borescope on a 20 mm inspection hole is worth more than a torch and a mirror.

Water test. Plug both ends, fill to 50 mm head, hold for 30 minutes, and check every seam with a dry tissue. Any damp mark is a failed joint. Do this before the duct is insulated or enclosed.

Internal smoothness. Run a soft rag on a rod through the full length. It should not snag. A snag means a weld bead or a screw tip sticking into the airstream.

Door gasket and latch. Close each door on a strip of paper and pull it out. Uniform drag all the way round means the gasket is seated; an easy section means a leak.

Dimensions and slope marks. Mark the high and low ends on the duct with a permanent marker before despatch. It sounds crude, but installers on a busy site follow those marks.

Four site failures I keep seeing

Grease duct is usually installed by a different crew from the one that fabricated it, and that handover is where the design intent gets lost. Four mistakes account for most of the call-backs I have been asked to investigate.

The fan is on the wrong end

If the exhaust fan pushes air through the duct instead of pulling it, every pinhole becomes a grease leak into the ceiling. It sounds obvious, yet I have walked into completed fit-outs where the fan was installed at the hood because the electrical point was closer. Check the direction on the fan curve and on the installed impeller before the duct is commissioned.

Doors facing a wall

Access doors are placed on the drawing in plan view, without checking what is on the other side. The cleaner arrives with a ladder and finds a 200 mm gap between the door and a cable tray. The remedy is always expensive. Walk the route before the doors are cut, and if space is tight, put the door on the underside with a sealed drain lip.

Insulation applied over an untested duct

Once the wrap goes on, a leaking weld is hidden. Insulate only after the water test has passed and been signed off. The same applies to the fire-rated enclosure: it is the last thing to go up, not the first.

No slope on a long horizontal run

Installers use equal-length hangers out of habit. On grease duct every hanger should be set to the marked fall, with a laser level or a water level over long distances. A 12 m run with 120 mm of fall is easy to set out in the shop and surprisingly hard to correct on site.

One more detail worth building in: label each section with the run number and the direction of airflow before despatch. A site crew assembling six similar branches in a busy ceiling will otherwise put a sloped section in backwards, and the reservoir ends up at the high point.

FAQ

Can a standard TDF flange be used on grease duct?

Yes, with a high-temperature gasket and welded flange-to-duct joints. The flange profile itself is fine; the problem is a mechanical lock on the duct body or an ordinary room-temperature gasket at the joint.

How often do access doors really need to be fitted?

At every change of direction, within 3 m of the hood, and at 3 m intervals on horizontal runs. Check the local code as well, since some authorities ask for closer spacing on high-volume cooking lines.

Is 1.2 mm stainless acceptable for a small Kitchen duct?

I would not use it. Welding distortion on 1.2 mm makes a smooth interior hard to achieve, and repeated cleaning will eventually deform the panels. The saving on a short run is not worth the inspection risk.

Why does the inside of my stainless weld turn brown?

Oxidation from the back of the weld. You need an argon purge on the inside until the weld has cooled. Grinding the brown colour off removes some of the protective layer too; prevent it instead of polishing it after.

If you are specifying equipment for this kind of work, add time for the welded closure. It is the slowest station in the whole process and the one that decides whether the duct passes inspection.